Facebook  Twitter  Linkedin  YouTube
Thursday , 11 April 2024

Tag Archives: Brihanmumbai Drain Work

Sahar runway being constructed

The international runway at Sahar, Mumbai is being reconstructed. The repair work is being carried out in three phases between September 2010 and July 2011. In the first phase, reconstruction of Runway 27 End (requiring shortening of runway 09/27 on the runway 27 end by 463 meters) is undertaken. Reconstruction of this end requires the change of runway gradient to ...