Facebook  Twitter  Linkedin  YouTube
Monday , 25 March 2024

Tag Archives: Traffic & Transport

Integrated Control Centre for Metros

What happens when a metro railway system is approved? Consider a case where a metro has three isolated lines ? Line 1, Line 2 and Line 3. The metro follows a distributed management and operational model with each line having its own signalling system. The three lines have different control centres and they operate in different manners. After approval, the ...