Facebook  Twitter  Linkedin  YouTube
Friday , 26 April 2024

Tag Archives: BlackBerry

Bangalore does it with Blackberry

Today, nearly 50 major works related to surface transport are going on in Bangalore city - flyovers, underpasses, road widening and Metro work. Roads have been dug up for laying water sewerage pipe lines or power / telephone cables along 60km, which has affected 80 junctions. There are 70-80 junctions with traffic diversions. The number of vehicles on the roads has reached 35 lakh of which 75% are two-wheelers. There are 40,000 intersections of which at least 1000 require constant monitoring. Topping all these is the shortage of the police personnel. Yet, under the leadership of Praveen Sood, the Additional Commissioner of Police, Traffic, the Bangalore City Traffic Police has been keeping the city very much ‘under control’. Sood spoke with TrafficInfraTech’s Editor-in-Chief Mangala Chandran on the City’s Traffic Management Centre (TMC) and the adoption of technology to collect, process and disseminating traffic data.